Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsHeat Exchanger Steel Pipe

Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing

Good company with professional service and high quality. Delivered in time. Our most trusted partner for alloy steel pipes.

—— Brent

The P91 and P22 supplied from NEW FORCE fully satisfies requirement of our project in Brazil. Good to work with NEW FORCE team.

—— Nicolas

I'm Online Chat Now

Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing

Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing
Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing

Large Image :  Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing

Product Details:

Place of Origin: China
Brand Name: NEW FORCE
Certification: ISO
Model Number: 304,316

Payment & Shipping Terms:

Minimum Order Quantity: negotiable
Price: negotiable
Packaging Details: Sea Worthy Packing
Delivery Time: 5~15 weeks
Payment Terms: L/C, T/T
Supply Ability: 1000 tons per month
Detailed Product Description
Steel: 304,316 Material: ASTM
OD: 10 - 1200 Mm Length: 1 - 12M
Technique: Hot Rolled Special Pipe: Heat Exchanger Tube
High Light:

Seamless 316 Stainless Steel Tubing

,

ASTM SS316 Tubing

,

Heat Exchanger SS316 Tubing

Stainless steel tube for heat exchanger
 

Specifications:

Commodity Hot Rolled Stainless Seamless Steel Tube/Pipe for Air Condition Boiler and Heat Exchanger (AISI 304 316L 201 2205 Grades)
Standards ASTM / ASME,GB,DIN, JIS,T14975, etc
Steel Grade 200 (Ni : 0.8%), 201B (Ni : 3%) , 201H (Ni : 5%) ,
301 (Ni :6%), 303, TP304, TP304L/304L, 321 ,TP321, 316, TP316L, 316L, 316Ti, 317, 317L, 309S, 310S(2520), 347, Duplex 2205, Duplex 2207,etc
Out Diameter 0.1~4500mm
Wall
Thickness
0.01~250mm
Length 5.8m or according to clients' requirements
Tolerance Out diameter : ±0.15mm
Thickness: ±% of wall thickness
Length: ±-4.5mm ~ 0mm
Surface Mirror Polish,Satin Polish,Without Polish,NO.1,NO.4,bright finish
MOQ 1 ton
Supply ability 5000 Ton/Tons per Month
Packing 1, with plastic cap to protect both ends
2,plastic bag wrapped outside the pipe
3, bundles to be covered by polythene & strapped securely
4,if require, the pack into wooden box
Payment terms L/C at sight,T/T(30% deposit), etc.
Delivery terms FCA/FOB/CFR/CIF/DAP
Delivery time Within7-10 days after received 30% deposit
Certificate ISO 9001 and third party inspection, SGS,BV

 

Heat Exchanger ASTM Seamless 316 Stainless Steel Tubing 0

Contact Details
Xi'an New Force Energy Engineering Co.,Ltd

Contact Person: zaya_z

Send your inquiry directly to us (0 / 3000)